Today was the start of the work on Viper #29.
The day started off with a drive to Adrienne's Uncle's farm to pick the boat up from storage. No doubt the tires were flat. Thankfully it was just a slow leak, so I was able to tow it home.
Once I got the boat home I started on the work. Here's a list of what I was able to get done today.
- Removed Old Hiking Straps
- Removed locker hatches
- Removed cockpit floor inspection port
- Added 2 new 4" inspection ports to the forward end of the lockers
- Re-installed locker hatches (you're suppose to re-install them upside down so you don't snap the hinges)
- Attempted to install a new 6" inspection port to the cockpit floor but it was the wrong size
- Installed 4 pad eyes and safety lines.
Here's some pictures of the work.
Cheers!
Darren
No comments:
Post a Comment